Print

A series of successful jobs for National Day 70th Anniversary (September 30 to October 6)

During National Day 70th Anniversary, our Wireline Mechanical Sidewall Coring Team acquired 63 large size (φ38 mm) cores by LHFCT tool in Songyuan Oilfield, China.

Wireline Testing Team measured 45 pressure points by pipe convey formation tester in a Middle East offshore horizontal well with 2,940 meters depth and 81 degrees inclination.

And, Logging While Logging Team had successful finished a Fullset MWD/LWD (MWD+GR+Resisitivity+Neutron+Density) job by 6.75 in. ComLWD Tools.