RSS/LWD operation in Daqing Oilfield, ChinaFrom November 11 to 18, 2020, Geo-Vista had finished Logging-While-Drilling operation in Daqing Oilfield, China. Team used 6.75 in. InteLWD tools with 8.5 inches bit size. The operation included: Rotary Steering System (RSS), Pressure Unit While Drilling (PWD), Near-Bit Azimuth Gamma Ray (AGR), and Electromagnetic Propagation Resistivity (EPR). The DownLink Command was good, and Bi-Directional Communication was reliable. The start depth was 2156 meters, the total depth (TD) was 3216 meters, the horizontal drilling distance was 1060 meters, the true vertical depth (TVD) was 1881.41 meters, and the well deviation was 90.71 degrees with 184.73 degrees in azimuth. Real-Time Curves: Interpretation Curves: |